3300 results found

Hold-open system FA GC 160
Wiring diagram

Hold-open system FA GC 160

GEZE hold-open device FA GC 160 GB Wiring diagram Instructions for installation, commissioning, operation and maintenance RSZ6, TS 4000 R, TS 4000 RFS, TS 4000 R-IS, TS 5000 R, TS 5000 RFS, TS 5000 RFS KB, TS 5000 R-ISM, TS 5000 R-ISM EFS …  GEZE hold-open device FA GC 160 Table of contents … 1 Key to symbols … 2 Notes … Assembly and electrical connection of the hold-open device … Installation of lintel smoke switch … Protection of a lintel smoke switch against dirt accumulation … Waste disposal … 3 Hold-open device FA GC 160 … Operation … Hold-open device with separate smoke switch control unit RSZ6 … Integrated hold-open device … Classification according to EN 14637 … Fire alarm and manual release button design … … .1 … .2 … .3 Smoke detector or temperature sensor … Number and installation of the fire alarm … Manual release button … 10 … Technical data … 11 … Hold-open device FA GC 160 … 11 Guidelines … 11 Power pack … 11 Lintel smoke switch GC 161 … 12 Ceiling smoke detector GC 162 … 14 Ceiling temperature sensor GC 163 . … 15 Manual release button UTA … 16 … Wiring diagram … 17 … Mains connection … 17 … .1 … .2 Mains connection for protection class I Mains connection for protection class II … 17 . … 18 … Ceiling detector … 18 … .1 Ceiling detectors GC 162 and GC 163 … 18 … Manual release button UTA … 20 … .1 … .2 Manual release button UTA with line monitoring … 20 Manual release button UTA without line monitoring … 21 … Alarm output … 22 Hold-open device … 22 … .1 … .2 … .3 … .4 … .5 … .6 … .7 … .8 Hold-open device RSZ6 … 22 Hold-open systems TS 4000 R, TS 4000 RFS … 26 Hold-open system TS 4000 R-IS … 26 Hold-open system TS 5000 R … 26 Hold-open system TS 5000 R-ISM … 27 Hold-open system TS 5000 R-ISM-EFS … 27 Hold-open system TS 5000 RFS … 27 Hold-open system TS 5000 RFS-KB … 27 … Commissioning … 28 … Examination of the self-closing feature of the door … 28 … .1 … .2 1-leaf door … 28 2-leaf door … 28 … Testing the smoke detector . … 28 … .1 … .2 GC 161 … 28 GC 162 … 28 … Testing the temperature sensor … 29 … .1 GC 163 … 29 GEZE hold-open device FA GC 160  … Acceptance test … 29 … Maintenance … 30 … Routine check … 30 Annual inspection and maintenance … 30 EN 14637 Approval Nr.: Z- … -2192 Certifying authority: BWU33 … Key to symbols … GEZE hold-open device FA GC 160 Key to symbols Warning In these instructions, warnings are used to warn against material damage and injuries. XX Always read and observe these warnings. XX Follow all instructions marked with the warning symbol and the word WARNING. Warning symbol Warning DANGER – CAUTION Meaning Danger for people. Non-observance can result in death or serious injuries. Information to prevent damage to property and to understand and optimise workflow. Further symbols used in these instructions Important information and technical notes are emphasised to illustrate the correct operation. Symbol Meaning means “Important note“ means “Additional information” Symbol for a user action. Here you have to take an action. XX Observe the sequence if there are several action steps. XX Abbreviations AL AS E EMC FA FS GC GND HOD IS ISM KB LED LK MRB NC … Alarm Ceiling detector (additional sensor) Electrical hold-open Electromagnetic compatibility Hold-open system Free swing GEZE Reference potential (ground) Hold open device Integrated closing sequence Integrated closing sequence (mechanical) Transom mounting on hinge side Light-emitting diode Insulating screw joint Manual release button Normally closed contact NO R Normally open contact Electrical hold-open with lintel detector and power pack (hold-open system) RSZ Smoke switch control unit TS Door closer UTA Breaker switch Colours BK Black BN Brown BU Blue GN Green RD Red YE Yellow WH White Notes àà According to the definition of manufacturer's liability for his products in the Product Liability Act, the information contained in this brochure are to be followed. Ignoring this information absolves the manufacturer from his liability. àà For the safety of persons, it is important to follow these instructions. àà Follow the installation instructions for the hold-open system and its assemblies. àà When used in fire and smoke protection doors, all local regulations should be observed. àà Keep these documents. … Assembly and electrical connection of the hold-open device àà The assembly of the hold-open device should only be done by trained professionals. See installation instructions of the hold-open device. àà The connection of the hold-open device to the mains voltage must be performed by a qualified electrician. àà Hold-open devices should not trigger a fire alarm signal for the building. àà Only the devices approved in the certificate should be installed and connected. … GEZE hold-open device FA GC 160 … Notes Installation of lintel smoke switch àà Install the lintel smoke switch only after completion of construction at the time of the initial operation of the hold-open device. àà The lintel smoke switch is a sensitive electronic product and must be protected against electrostatic discharge: àà Remove the protective packaging of the lintel smoke switch only immediately before installation. àà Do not touch electronic components. àà Disconnect the power supply before installation of the lintel smoke switch. Fig.: … .1 àà The lintel smoke switch is clipped into the housing of the hold-open device. Fig.: … .2 … Protection of a lintel smoke switch against dirt accumulation àà The dust protection film or dust cover of a smoke switch should only be removed at the time of commissioning. àà After the installation of the smoke switch and removal of the dust cover, ensure that dust does not enter the measuring chamber. Otherwise it may result in increased dust accumulation that can significantly shorten the service life of the smoke switch. àà The measuring chamber of a smoke switch should not be opened. Fig.: … .1 … Waste disposal The hold-open device consists of materials that should be given for recycling. For this purpose, the individual components are to be sorted according to their materials. The parts can be disposed of at the local recycling centre or through a scrap recycling company. … Hold-open device FA GC 160 GEZE hold-open device FA GC 160 … Hold-open device FA GC 160 … Operation Immediately after opening a fire or smoke protection door, it is again closed by the mounted door closer. This selfclosing feature is overridden in a controlled manner by the hold-open device, so that a fire or smoke protection door can remain open indefinitely. In case of power failure, triggering of a fire alarm or activation by a button, an open door is closed by the door closer. Integrated hold-open system Smoke switch control unit RSZ … Power supply Lintel smoke switch with Triggering device … 1 Ceiling detector … Ceiling detector … Manual release button … Manual release button … 6 Hold-open device 1-wing/ 2-wing … Fig. … .1 GEZE hold-open device FA GC 160 … Hold-open device FA GC 160 Hold-open device with separate smoke switch control unit RSZ6 The hold-open device RSZ6 consists of: àà Power supply (1) àà Power pack RSZ6 àà Lintel smoke switch with triggering device (1) àà GC 161 àà Ceiling detector (2) àà GC 162, Smoke detector with base àà GC 163, Temperature sensor with base àà Manual release button (3) àà UTA, breaker switch àà Hold-open device (1) Overhead door closer àà TS 4000 E Rods, electro-hydraulic hold-open device àà TS 4000 EFS Rods with free swing function, electro-hydraulic hold-open device àà TS 4000 E-IS Rods, 2-wing with integrated closing sequence, electro--hydraulic hold-open device for both wings àà E guide rail Electromagnetic hold-open device àà E-ISM guide rail 2-wing with integrated closing sequence, electromagnetic hold-open device for both wings àà E-ISM/G guide rail 2-wing with integrated closing sequence, electromagnetic hold-open device for the active wing àà ISM-EFS guide rail 2-wing with integrated closing sequence, electro-hydraulic hold-open device for the active wing with free swing function àà TS 5000 EFS Guide rail with free swing function, electro-hydraulic hold-open device Integrated door closer àà E guide rail Boxer Electromagnetic hold-open device àà E-ISM guide rail Boxer 2-wing with integrated closing sequence, electromagnetic hold-open device for both wings àà ISM-EFS guide rail Boxer 2-wing with integrated closing sequence, electro-hydraulic hold-open device for the active wing with free swing function àà BOXER EFS Guide rail with free swing function, electro-hydraulic hold-open device Floor door closer àà TS 550 NV-E Electro-hydraulic hold-open device àà TS 550 E Electromagnetic hold-open device àà TS 550 E-IS 2-wing with integrated closing sequence control, electromagnetic hold-open device Holding magnet àà GT50R … Hold-open device FA GC 160 … GEZE hold-open device FA GC 160 Integrated hold-open device In addition to the hold-open device with separate smoke switch control unit RSZ6, the following locking systems with integrated hold-open device are available for overhead door closers: àà TS 4000 R Rods, electro-hydraulic hold-open device àà TS 4000 RFS Rods with free swing function, electro-hydraulic hold-open device àà TS 4000 R-IS Rods, 2-wing with integrated closing sequence, electro--hydraulic hold-open device for both wings àà TS 5000 R Guide rail, electromagnetic hold-open device àà TS 5000 R-ISM Guide rail, 2-wing with integrated closing sequence, electromagnetic hold-open device for both wings àà TS 5000 R-ISM Guide rail, 2-wing with integrated closing sequence, electromagnetic hold-open device for the active wing àà TS 5000 R-ISM-EFS Guide rail, 2-wing with integrated closing sequence, electro-hydraulic hold-open device for the active wing with free swing function àà TS 5000 RFS Guide rail with free swing function, electro-hydraulic hold-open device àà TS 5000 RFS-KB Guide rail with free swing function, transom mounting on hinge side, electro-hydraulic hold-open device … Classification according to EN 14637 GEZE D-71229 Leonberg +49 (0)7152/203-0 MM/JJJJ … 3/4 Input 230 V AC 0.08A Output 24 V DC 0.26A IP 30 Item … Class … Application class Item … Class … Continuous function Frequent use by the public and other persons with little incentive to care 500,000 test cycles Item … Class … Door type Three-wing revolving doors Item … Class … Suitable for use in fire and smoke protection doors Item … Class … Suitability for use in fire and smoke protection doors Safety Item … Class … Corrosion resistance High resistance according to EN 1670 (in conjunction with the holding magnets GT50R) Very high resistance according to EN 1670 (in conjunction with all other GEZE hold-open devices) Class … 8 Hold-open device RSZ6 Serial No. CA Identification No. BWU33 EN 14637 … 8 … 1 Meets all requirements of EN 14637 GEZE hold-open device FA GC 160 Hold-open device FA GC 160 … Fire alarm and manual release button design … .1 Smoke detector or temperature sensor Smoke detectors recognise smoke. They operate on the principle of diffused light. A light emitter and a light receiver are arranged in the measuring chamber in such a way that normally no light falls on the receiver. If there are suspended particles (smoke) in the measuring chamber, this scatters a portion of the light on the receiver, which converts it into an electrical signal. A smoke detector recognises not only smoke, but also all other suspended particles and is sensitive to pollution. Temperature sensors measure the ambient temperature and respond if the temperature exceeds a predetermined maximum value or increases dramatically within a certain time. Usually smoke and fumes spread quickly in case of a fire. The rise in temperature occurs only after a delay. That is why for fire doors on escape routes only smoke detectors should be used in hold-open devices. Smoke detectors should generally be used for hold-open devices as far as possible. In areas with interferences such as steam, dust, condensation or operation-related smoke emissions (workshops, kitchens), it makes more sense to use temperature sensors instead of smoke detectors. … .2 Number and installation of the fire alarm Distance between the lower edge of lintel and ceiling or false ceiling (where there is a fire, a larger concentration of smoke is to be expected first). h Lintel smoke switch Ceiling detector A lintel smoke switch àà if the distance h on either side of the door is less than 100 cm and … h < 100 cm < 10 cm If necessary, smoke-permeable false ceiling àà if the opening width of the door is less than 300 cm Fig.: … . … A lintel smoke switch and a ceiling detector on each side of the door àà if the distance h on at least one side of the door is more than 100 cm > 50 cm < 250 cm or àà if the opening width of the door is more than 300 cm < 10 cm > 50 cm < 250 cm If necessary, smoke-permeable false ceiling h ≥ 100 cm Fig.: … . … Hold-open device FA GC 160 GEZE hold-open device FA GC 160 Lintel smoke switch àà The lintel smoke switch is mounted directly above the door, above the active leaf for 2-leaf doors. The installation of the lintel smoke switch is done in such a way that there is a gap of at least … cm between ceiling or door lintel and upper smoke outlet. àà The lintel smoke switch is only suitable for wall mounting; do not mount on the ceiling. If the lintel smoke switch is exposed to disturbances such as steam, dust, condensation or operations-related smoke emission, it may be useful to cover the smoke chamber of the lintel smoke switch and instead, mount an additional temperature sensor as lintel smoke switch by means of a mounting bracket above the door (not permitted in escape routes). Ceiling detector àà The ceiling detectors are mounted on the ceiling above the door, the distance to the wall is between 50 cm and 250 cm. àà If the distance h on one side of the door is greater than 500 cm, then the corresponding ceiling detector can be mounted on a cantilever 50 cm from the wall and at least 350 cm above the lower edge of the lintel. … .3 Manual release button Manual release button optional: The hold-open devices àà TS 4000 E, TS 4000 E-IS àà E guide rail, E-ISM guide rail, E-ISM/G guide rail àà E guide rail Boxer, E-ISM E guide rail Boxer àà TS 550 NV-E, TS 550 E, TS 550 E-IS and the hold-open systems àà TS 4000 R, TS 4000 R-IS àà TS 5000 R, TS 5000 R-ISM, TS 5000 R-ISM/G can be ativated manually, by closing the door wing by hand. A manual release button can be installed optionally. Manual release button is prescribed: The hold-open devices àà TS 4000 EFS àà TS 5000 EFS àà ISM-EFS guide rail àà BOXER EFS, ISM-EFS guide rail Boxer àà GT50R and the hold-open systems àà TS 4000 RFS àà TS 5000 RFS, TS 5000 RFS-KB, TS 5000 R-ISM-EFS cannot be activated manually. Therefore, a manual release button should be mounted. Installation of the manual release button àà Install the manual release button at an easily visible position in the immediate vicinity of the door (not hidden by the door wing). àà Installation height of the manual release button: 140 cm ± 20 cm. 10 GEZE hold-open device FA GC 160 Technical data … Technical data … Hold-open device FA GC 160 … Protection class (according to DIN EN 61140) I Protection type (according to DIN EN 60529) Ambient temperature IP20, only for dry rooms II RSZ6, TS 5000 R, TS 5000 RFS, TS 5000 R-ISM, TS 5000 R-ISM EFS -5°C to 50°C Guidelines DIN EN 60950-1; VDE 0805-1:2011-01 DIN EN 61000-6-2; VDE 0839-6-2:2006-03 DIN EN 61000-6-3; VDE 0839-6-3:2007-09 DIN EN 1155:2003-04 DIN EN 14637:2008-01 DIBt-guidelines DIN EN 54-4:1997-12 DIN EN 54-5:2000-03 DIN EN 54-7:2006-09 DIN 14677:2011-03 … TS 4000 R, TS 4000 RFS, TS 4000 R-IS, TS 5000 RFS KB Information Technology Equipment - Safety - Part 1: General Requirements Electromagnetic compatibility (EMC) - Part 6-2: Generic standards Immunity for industrial environments Electromagnetic compatibility (EMC) - Part 6-3: Generic standards Emission standard for residential. commercial and light-industrial environments Building hardware - Electrically powered hold-open devices for swing doors - Requirements and test methods Building hardware - Electrically controlled hold-open systems for fire/ smoke door assemblies - Requirements, test methods, application and maintenance General requirements and test standards for the approval process for hold-open devices - July 2012 version Fire alarm systems - Part 4: Power supply equipment Fire alarm systems - Part 5: Heat sensors - Point-shaped detectors Fire alarm systems - Part 7: Smoke detectors - Point-shaped detectors according to the disffused light, transmitted light or ionisation principle Maintenance of electrically controlled hold-open systems for fire protection and smoke barriers Power pack Power pack - Cable length 230V / 24V - Cable length 230V / 24V - Cable length 230V / 24V Input voltage Input current Output voltage Output current 130mm / 150 mm (Mat. No. 085391) 90 mm / 65 mm (Mat. No. 103354) 700 mm / 750 mm (Mat. No. 115818) 230 V AC +10 % / -15%, 50 Hz Maximum 80 mA 24 ± … V DC Maximum 260 mA 11 Technical data … GEZE hold-open device FA GC 160 Lintel smoke switch GC 161 Lintel smoke switch GC 161 Functional principle Input voltage Input current Installation position Output hold-open device Additional detectors Manual release button Alarm output Reset button Detector test Mat. No. 140458 Diffused light, alarm threshold tracking, no alarm memory (self-resetting when there is no more smoke in the measuring chamber) 24 V DC Maximum 15 mA Wall (lintel) installation, horizontal Transistor output, short circuit proof Free-wheeling diode for inductive load Maximum 24 V, 200 mA In case of alarm, shutdown of the hold-open device for a minimum of … s Connect up to … ceiling detectors in 2-wire system Line monitoring by termination resistor ( … kΩ) at the end of the line Line monitoring (can be disabled) by termination resistor (43 kΩ) at the end of the line With active line monitoring connect the manual trigger switch as closer, with inactive line monitoring connect the manual trigger switch as opener. Potential free relay output, changeover contact maximum 24 V DC / maximum … A Shut-down of the hold-open device, as long as the button is pressed (for at least … s) Reset the smoke switch by pressing the button Alarm activation - with reset button - with test gas ON OFF Supply External hold-open device Manual release button Ceiling detector … Ceiling detector … Alarm output OFF ON OFF ON OFF ON No alarm if manual release button is active Alarm if manual release button is active Manual release button without line monitoring Manual release button with line monitoring Without ceiling detector With ceiling detector OFF ON Without manual release button With manual release button Bold Factory setting Measuring chamber Internal hold-open device Reset button LED display for status and fault indication Fig. … .1 12 GEZE hold-open device FA GC 160 Technical data Status / Error LED Without voltage Off AL_NC 11 0V Lintel smoke switch alarm Ceiling detector alarm RD AL_COM 12 0V AL_NO 13 Normal operation GN Dust accumulation (warning) The lintel smoke switch should be replaced. RD Dust limit is reached The lintel smoke switch should be replaced. RD Error lintel smoke switch The lintel smoke switch should be replaced. RD Short circuit at locking output Separate lintel smoke switch from the supply voltage and eliminate the short circuit. Supply voltage too low for lintel smoke switch Line breakage of manual release button1) Supply voltage too low for ceiling detector … Short circuit of ceiling detector … Ceiling detector … line breakage Ceiling detector … removed Supply voltage too low for ceiling detector … Short circuit of ceiling detector … Ceiling detector … line breakage Ceiling detector … removed Reset button actuated Manual release button actuated Short circuit of manual release button1) Alarm output Locking output KL1: 3-4, KL3: 1-2 24 V 24 V GN 0V GN 0V off 0V RD off RD AL_NC 11 AL_COM 12 AL_NO 13 0V off 0V RD off 0V RD off YE YE 0V DIP4=OFF AL_NC 11 AL_COM 12 AL_NO 13 0V DIP4=ON 1) Indication only in case of line monitoring AL_NC 11 Manual release button active (DIP3 = ON) AL_COM 12 AL_NO 13 Tab. … .1 13 Technical data … GEZE hold-open device FA GC 160 Ceiling smoke detector GC 162 Smoke detector with base GC 162 consists of Smoke detector GC 002 D Colour Dimensions (with base, DxH) Functional principle Insect screen Input voltage Input current Installation position Termination resistor Alarm resistance Current increase principle - No alarm - Alarm Detector test … mA 10 mA Alarm activation - with test magnet in the vicinity of the magnetic sensor (GEZE logo) - with testing gas Signalling LED Off Normal operation Off Alarm RD Without voltage Mat. No. 139882 Base GC 160 B Smoke detector GC 002 D Mat. No. 141458 white, RAL 9016 110 mm x 54 mm Diffused light, alarm threshold tracking, no alarm memory (self-resetting when there is no more smoke in the measuring chamber) prevents insects from entering the measuring chamber 24 V DC Maximum 10 mA Ceiling mounting … kΩ, integrated, separable … kΩ Current consumption … mA … mA 10 mA Tab. … .1 GC 160 B … 6,8kΩ GND … 1 … 14 Fig. … .1 Fig. … .2 Magnetic sensor for testing (behind GEZE logo) LED for status indication GEZE hold-open device FA GC 160 … Technical data Ceiling temperature sensor GC 163 Temperature sensor with base GC 163 consists of Temperature sensor GC 003 D Colour Dimensions (with base, DxH) Functional principle Alarm temperature EN 54-5 Class Input voltage Input current Installation position Termination resistors Alarm resistance Current increase principle - No alarm - Alarm Detector test Mat. No. 139883 Base GC 160 B Temperature sensor GC 003 D Mat. No. 141459 white, RAL 9016 110 mm x 54 mm Alarm if ambient temperature exceeds the alarm temperature or if the ambient temperature increases very quickly, no alarm memory (self-resetting when the ambient temperature has fallen again) 57°C A1R 24 V DC Maximum 10 mA Ceiling mounting … kΩ, integrated, separable … kΩ … mA 10 mA Alarm activation - with test magnet in the vicinity of the magnetic sensor (GEZE logo) - with heat detector test apparatus Signalling Without voltage LED Current consumption Off … mA Normal operation Off Alarm RD … mA 10 mA Tab. … .1 GC 160 B … 6,8kΩ GND … 1 … Fig. … .1 Fig. … .2 Magnetic sensor for testing (behind GEZE logo) LED for status indication 15 Technical data … GEZE hold-open device FA GC 160 Manual release button UTA Type Breaker switch Surface box Circuit type Circuit voltage Switching current Termination resistor UTA, AS500 Mat. No. 116266 Mat. No. 120503 one changeover Maximum 250V Maximum 10A 43 kΩ 43kΩ Fig. … .1 16 GEZE hold-open device FA GC 160 … Wiring diagram Wiring diagram àà àà àà àà Observe the requirements for selection and installation of fire detectors and manual alarm button in chapter … . Observe in addition the installation instructions of the respective hold-open device. The connection of the hold-open device to the mains voltage must be performed by a qualified electrician. Before carrying out work on the electrical system, disconnect voltage supply and check that it is free of voltage. If you use an uninterruptible power supply, the system is also under voltage with mains activation. àà Only use the specified cable types. àà Labelling of on-site cable in these instructions: (1) NYM-J, 3x1.5 mm2 (2) NYM-O, 2x1.5 mm2 or NYM-J, 3x1.5 mm2 (3) J-Y(ST)Y, 2x0.6 mm2 or J-Y(ST)Y, 2x0.8 mm2, maximum length less than 15 m (4) J-Y(ST)Y, 2x0.6 mm2 or J-Y(ST)Y, 2x0.8 mm2, maximum length less than … m (5) J-Y(ST)Y, 2x2x0.6 mm2 or J-Y(ST)Y, 2x2x0.8 mm2, maximum length less than 15 m (6) J-Y(ST)Y, 2x2x0.6 mm2 or J-Y(ST)Y, 2x2x0.8 mm2, maximum length less than … m Non-labelled connections are system cables, only these should be used. àà The cables should be adequately protected and secured mechanically. àà Insulate unused wires. … Mains connection àà The GEZE hold-open systems are devices of protection class I and protection class II according to DIN EN 61140. àà As a mains separation device, an on-site circuit breaker B 10 A should be used. àà The 230 V supply line is double insulated (with cable jacket), to be inserted at least … mm into the terminal area. àà Total current consumption in the power pack up to 260 mA. … .1 Mains connection for protection class I Power pack for Mat. No. Cable length 230V / 24V TS 4000 R, TS 4000 RFS, TS 4000 R-IS, TS 5000 RFS KB 103354 90 mm / 65 mm àà Appliances of the protection class I are connected with a three-core cable NYM-J, 3x1.5 mm2. The ground wire is connected to the PE terminal. Power pack GC 161 maximum PE Fig. … . … 17 Wiring diagram … .2 GEZE hold-open device FA GC 160 Mains connection for protection class II Power pack for Smoke switch control unit RSZ6 Mat. No. Cable length 230V / 24V 085391 130 mm / 150 mm TS 5000 R, TS 5000 RFS, TS 5000 R-ISM, TS 5000 R-ISM-EFS No. 115818 700 mm / 750 mm àà Appliances of the protection class II are connected with a two-core cable NYM-O.2x1.5 mm2. The connection can also be done with a three-core cable NYM-J … x … mm2. Then the ground wire should not be connected and must be insulated permanently (e.g. additional insulating screw joint or shrink tubing). Power pack GC 161 maximum Fig. … . … Ceiling detector àà Observe the requirements on the selection and installation of ceiling detectors in chapter … . àà When connecting ceiling detectors, set switch DIP … of the lintel smoke switch GC 161 to ON. … .1 Ceiling detectors GC 162 and GC 163 àà The ceiling smoke detector GC 162 consists of the smoke detector GC 002 D and the base GC 160 B. àà The ceiling temperature sensor GC 163 consists of the temperature sensor GC 003 D and the base GC 160 B. àà Ceiling smoke detector with base GC 162, Mat. No. 139882 Ceiling temperature sensor with base GC 163, Mat. No. 139883 Smoke detector GC 002 D, Mat. Nr. 141458 Temperature sensor GC 003 D, Mat. No. 141459 Fig. … . … 18 GEZE hold-open device FA GC 160 Wiring diagram Ceiling temperature detector GC 163 as lintel smoke switch àà If the lintel smoke switch GC 161 is exposed to disturbances such as steam, dust, condensation or operation-related fumes, it is reasonable to use a temperature sensor as lintel detector. See notes on this in chapter … . àà An additional temperature sensor GC 163 as lintel detector mounted above the door with mounting bracket DM GC. See notes on this in chapter … (mounting bracket, white, RAL 9016, Mat.-No. 150264). àà Protect the smoke chamber of the integrated lintel smoke switch against dirt accumulation with dust cap (Mat. No. 146407). Fig. … . … Connecting a ceiling temperature sensor GC 163 as lintel detector Fig. … . … Ceiling detector as lintel smoke switch 19 Wiring diagram GEZE hold-open device FA GC 160 Connecting a ceiling temperature detector GC 163 as lintel smoke switch and two other ceiling detectors Remove termination resistor on the ceiling temperature detector GC 163. Ceiling detector as lintel detector Ceiling detector Ceiling detector Fig. … . … Manual release button UTA àà Breaker switch UTA, AS500, Mat. No. 116266 Surface cap 1-way, AS500, Mat. No. 120503 àà When connecting a manual release button, set switch DIP … of the lintel smoke switch GC 161 to ON. àà Observe the requirements for the installation of manual release button in section … . … .1 Manual release button UTA with line monitoring The building authority approval requires the line monitoring of the manual release button, if the connection to a manual release button is based on the stipulated standard (see chapter … ). The line monitoring is active, if: àà switch DIP3 of the lintel smoke switch GC 161 is set to ON (see chapter … ). àà a 43 kΩ resistor is connected in parallel in the manual release button. 20 GEZE hold-open device FA GC 160 Wiring diagram Connect manual release button as a closer. Fig. … . … Several manual release buttons can be connected in parallel. Connect 43 kΩ resistor only in the last one. … .2 Fig. … . … Manual release button UTA without line monitoring The monitoring is not active if: àà switch DIP3 of the lintel smoke switch GC 161 is set to OFF (see chapter … ). Connect manual release button as an opener. Fig. 5. … .1 Several manual release buttons can be connected in parallel. Fig. … . … 21 Wiring diagram … GEZE hold-open device FA GC 160 Alarm output àà Potential free relay contact, changeover contact, up to 24 V, … A àà The contact 12-13 is open in normal operation, closed in case of power failure or alarm. àà Do not supply alarm display from the hold-open system. 24 V external Whether the alarm output is switched when operating the manual release button is set with the button DIP4 of the lintel smoke switch GC 161. (DIP4 = ON: Alarm upon actuation of the release button) Alarm display GND external Fig. … .1 … Hold-open device àà External hold-open devices are connected to KL1 of the lintel smoke switch (screw-plug terminal). Internal hold-open devices are connected to KL3 of the lintel smoke switch (system connector). … .1 Hold-open device RSZ6 Door closers TS 4000 E, TS 4000 EFS Door leaf mounting àà Junction box with pluggable cable transition, Mat. No. 052105 GC 161 Junction box Doorway TS 4000 E, TS 4000 EFS Fig. … . … Transom mounting 22 Fig. … . … GEZE hold-open device FA GC 160 Wiring diagram Door closer TS 4000 E-IS Door leaf mounting àà Junction box with pluggable cable transition, Mat. No. 052105 GC 161 Junction box TS 4000 E-IS Doorway Active wing Switch is closed, if active wing is open Junction box Doorway Inactive wing Fig. … . … Transom mounting GC 161 TS 4000 E-IS Active wing Switch is closed, if active wing is open Inactive wing Fig. … . … E guide rail, E guide rail Boxer GC 161 E guide rail Fig. … . … 23 Wiring diagram GEZE hold-open device FA GC 160 E-ISM guide rail , E-ISM guide rail Boxer Guide rail Active wing Switch is closed, if active wing is open Guide rail Inactive wing Fig. … . … ISM-EFS guide rail, ISM-EFS-guide rail Boxer àà No hold-open device for the inactive wing àà Junction box with pluggable cable transition, Mat. No. 052105 GC 161 Junction box Doorway TS 5000 EFS Fig. … . … Door closer TS 5000 EFS Door leaf mounting àà Junction box with pluggable cable transition, Mat. No. 052105 GC 161 Junction box Doorway TS 5000 EFS Fig. … . … Transom mounting 24 Fig. … . … GEZE hold-open device FA GC 160 Wiring diagram Integrated door closer BOXER EFS Fig. … . … Bottom door closer TS 550 NV-E Fig. … . … Bottom door closer TS 550 E GC 161 TS 550 E KL1 GND … HOD … BU L=3m RD – + 15 mA 100 mA Fig. … . … Bottom door closer TS 550 E-IS àà Connection board, Mat No. 001102 àà Connection box, on-site Inactive wing Active wing Switch is closed, if active wing is open Connection board Connection box Switch is closed, if inactive wing is in the vicinity of the closed position Fig. … . … 25 Wiring diagram GEZE hold-open device FA GC 160 Holding magnet GT50R … .2 Fig. … . … Fig. … . … Hold-open systems TS 4000 R, TS 4000 RFS GC 161 KL3 GND … 3 HOD … 2 15 mA … 42 mA … .3 Hold-open system TS 4000 R-IS GC 161 Active wing KL3 GND … 3 HOD … 2 … 42 mA KL1 15 mA GND … RD Switch is closed, if active wing is open LK L=2m TS 4000 R- Second unit TS 4000 E Inactive wing … 2 … 42 mA … .4 Fig. … . … Hold-open system TS 5000 R GC 151 GC 161 LK KL3 GND … WH HOD … RD 15 mA 85 mA Fig. … . … 26 GEZE hold-open device FA GC 160 … .5 Wiring diagram Hold-open system TS 5000 R-ISM For TS 5000 R-ISM/G, no hold-open device in the inactive wing GC 161 KL3 24 V GND … – HOD … + SF 15 mA Active wing WH – RD + 85 mA Switch is closed, if active wing is open LK Inactive wing RD WH 85 mA Fig. … . … .6 Hold-open system TS 5000 R-ISM-EFS àà No hold-open device for the inactive wing àà Junction box with pluggable cable transition, Mat. No. 052105 GC 161 Junction box Doorway TS 5000 EFS Fig. … . … .7 Hold-open system TS 5000 RFS àà Door leaf mounting àà Junction box with pluggable cable transition, Mat. No. 052105 GC 161 Junction box Doorway TS 5000 EFS Fig. … . … .8 Hold-open system TS 5000 RFS-KB àà Transom mounting GC 151 GC 161 KL3 15 mA GND … 3 HOD … 2 … 42 mA Fig. … . … 27 Commissioning … Commissioning 1. 2. 3. Switch on the mains voltage. The status indicator of the lintel smoke switch glows green. Remove dust protection film or dust cap of the housing of the hold-open system, so that the smoke outlets are free. Remove protective covers of the ceiling detector. … Examination of the self-closing feature of the door … .1 1-leaf door 1. 2. 3. … .2 Fully open the door leaf. Door leaf is kept in the open position by the hold-open system. Press the reset button of the lintel smoke switch. Status indication glows yellow for about … seconds. The door leaf closes and snaps into the latch. If necessary, set manual disengagement torque in the open position: Fully open the door leaf. The ejection torque should be, according to EN 1155, between 40 Nm and 120 Nm with an opening angle of 90°. 2-leaf door 1. 2. 3. 4. … GEZE hold-open device FA GC 160 Fully open both door leaves. Door leaves are kept in the open position by the hold-open system. Press the reset button of the lintel smoke switch. Status indication glows yellow for about … seconds. The door leaves close complying with the closing sequence. Both door leaves close completely and the active leaf snaps into the latch. If necessary, set manual disengagement torque in the open position. Fully open both door leaves. The ejection torque should be, according to EN 1155, between 40 Nm and 120 Nm with an opening angle of 90°. Move active leaf by hand from the hold-open position, inactive leaf closes automatically. Active leaf stops and also closes if inactive leaf is closed. Testing the smoke detector Test gas, Mat. No. 059168 … .1 GC 161 Carry out the following steps within about … minutes: 1. 2. 3. Press the reset switch, the status display changes from green to red. Wait until the status display lights up green again. Fully open the door leaf. Door leaf is kept in the open position by the hold-open system. Now spray the test gas from a distance of about 15 cm into the free smoke opening in short bursts lasting about … s with … s between bursts, covering the upper smoke opening for this. The smoke detector must trigger (change of status indicator from green to red). The door closes. … .2 GC 162 1. 2. 3. 28 Fig. … . … Fully open the door leaf. Door leaf is kept in the open position by the hold-open system. Spray test gas from a distance of 10 cm to 15 cm into the free smoke outlet in short 1-second bursts at an interval of 10 seconds. The smoke detector must trigger (change of status indicator from green to red). The door closes. GEZE hold-open device FA GC 160 … Testing the temperature sensor … .1 GC 163 1. 2. … Acceptance test Fully open both door leaves. Door leaves are kept in the open position by the hold-open system. Check temperature sensor GC 163 with a test apparatus for heat detectors. The temperature sensor must trigger (change of status indicator from green to red). The door closes. The test can also be carried out using a hair dryer. The air flow must reach a temperature of at least 60°C but must not exceed 90°C. Acceptance test After the ready-to-use installation of the hold-open system on site, its correct installation and proper operation must be confirmed by an acceptance test. The acceptance test must be arranged by the operator. The acceptance test must be performed only by GEZE professionals, experts authorized by GEZE, or professionals of a test centre designated by DIBt in the approval process. The acceptance test must include the examination of the following points: 1. It should be verified that the installed devices and additional fire detectors, if any, of the hold-open device comply with the stipulations in the general building authority approval. 2. It should be verified that the markings of the installed devices and additional fire detectors, if any, comply with the marking stated in the general building authority approval. 3. The interaction of all devices should be verified on the basis of the general building authority approval, whereby the release must take place both through simulation of the characteristics of fire underlying the functional principle of the detector and by hand. 4. It should be verified whether the barrier for the automatic closure is enabled when the hold-open device is inoperable (e.g. by removal of a detector or by a power failure). After successful acceptance, a signboard (Set 10 Pcs Mat No. 79142) in the dimensions 105 mm x 52 mm with the inscription: àà Hold-open device àà Approved by .. .. (Trademark as well as month and year of acceptance) should be mounted in the immediate vicinity of the barrier by the operator. A certificate should be issued to the operator on the successful completion of the acceptance test; it must be kept by the operator. 29 Maintenance … Maintenance … Routine check GEZE hold-open device FA GC 160 àà The hold-open system must be permanently maintained in good operating condition by the operator, especially by paying attention that the doors are not blocked (e.g. by wedges, chains or other items that prevent the automatic closing of the door leaf). àà To ensure that the hold-open system is in good condition, routine testing must be performed on site at regular intervals. If no functional defects are found in the twelve consecutive function tests with an interval of a month, then the hold-open device needs to be checked only every … months. If a functional defect is found in the quarterly function tests, the operability should be restored immediately and this should be verified by at least three consecutive monthly function tests. àà This routine check may be performed by anyone according to the appropriate instructions by GEZE. The function test of a hold-open device must include at least the following elements: àà Verification of manual release (manual release button, or if permitted by manual disengagement); àà Verification of the release of the hold-open device by testing the fire detector (see Chapter 6); àà Verification of the automatic resetting of the fire detector from the alarm status; àà Checking whether ambient influences impair the function of the integrated hold-open device; àà Checking whether the use in the immediate vicinity of the hold-open device exercises negative influences on it (such as the presence of dust or water vapour); àà Checking whether the function of the hold-open device is negatively influenced by structural changes and/ or by interaction with other assembly sections in the immediate vicinity of the hold-open device (e.g. retrofitting of suspended ceilings) and whether the positioning of the fire detectors comply with the approval (see Chapter … ); àà Checking whether the fire or smoke barrier will be enabled after release of the automatic closure. Extent, results and time of the conducted function test are to be documented in the GEZE test book for holdopen device and made available the operator. These records shall be kept by the operator. Upon determination of apparent malfunction and/or damage to the fire and/or smoke barrier, the operator must be informed. … Annual inspection and maintenance àà In addition, the operator is responsible for the organisation of inspection and maintenance of all components of the hold-open system, thus ensuring that these components work together properly and without interference. This inspection and maintenance must be carried out at least once a year according to the manufacturer‘s recommendations. Scope, results and time of this annual inspection must be recorded in the GEZE test book for hold-open device, which needs to be kept by the operator. àà The regular maintenance and testing must be performed by a qualified person or a person trained for that purpose. The maintenance of the hold-open device must include the elements of a function test as described in Section … and the following additional elements: àà Checking for compliance with the documentation and the building authority approval; àà Cleaning of the functionally relevant components of a hold-open device, provided the dirt accumulation can make a negative impact; (the measuring chamber of a smoke detector must not be opened). àà Verification of the release of the hold-open device during a power failure; àà Verification of release of the hold-open device upon removal of a fire detector. Scope, results and time of the performed maintenance must be documented and made available to the operator. 30 GEZE hold-open device FA GC 160 Maintenance 31 Germany GEZE Sonderkonstruktionen GmbH Planken … 97944 Boxberg-Schweigern Tel. +49 (0) 7930-9294-0 Fax +49 (0) 7930-9294-10 E-Mail: sk.de@geze.com Austria GEZE Austria E-Mail: austria.at@geze.com www.geze.at Baltic States www.geze.com GEZE GmbH Niederlassung Süd-West Tel. +49 (0) 7152-203-594 E-Mail: leonberg.de@geze.com GEZE GmbH Niederlassung Süd-Ost Tel. +49 (0) 89-120 07 42-50 E-Mail: garching.de@geze.com GEZE GmbH Niederlassung Ost Tel. +49 (0) 30-47 89 90-0 E-Mail: berlin.de@geze.com GEZE GmbH Niederlassung Mitte/Luxemburg Tel. +49 (0) 6171-63610-0 E-Mail: frankfurt.de@geze.com GEZE GmbH Niederlassung West Tel. +49 (0) 201-83082-0 E-Mail: essen.de@geze.com GEZE GmbH Niederlassung Nord Tel. +49 (0) 40-2 19 07 16-13 E-Mail: hamburg.de@geze.com GEZE Service GmbH Tel. +49 (0) 18 02/92 33 92 E-Mail: service-info.de@geze.com GEZE GmbH Reinhold-Vöster-Straße 21–29 71229 Leonberg Germany Benelux GEZE Benelux B.V. E-Mail: benelux.nl@geze.com www.geze.be www.geze.nl Bulgaria GEZE Bulgaria - Trade www.geze.bg China GEZE Industries (Tianjin) Co., Ltd. E-Mail: Sales-info@geze.com.cn www.geze.com.cn GEZE Industries (Tianjin) Co., Ltd. E-Mail: chinasales@geze.com.cn www.geze.com.cn GEZE Industries (Tianjin) Co., Ltd. E-Mail: chinasales@geze.com.cn www.geze.com.cn GEZE Industries (Tianjin) Co., Ltd. E-Mail: chinasales@geze.com.cn www.geze.com.cn France GEZE France S.A.R.L. E-Mail: france.fr@geze.com www.geze.fr Tel.: 0049 7152 203-0 Fax: 0049 7152 203-310 www.geze.com Hungary GEZE Hungary Kft. www.geze.hu Iberia GEZE Iberia S.R.L. E-Mail: info@geze.es www.geze.es India GEZE India Private Ltd. www.geze.in Italy GEZE Italia S.r.l E-Mail: italia.it@geze.com www.geze.it GEZE Engineering Roma S.r.l E-Mail: roma@geze.biz www.geze.it Poland GEZE Polska Sp.z o.o. E-Mail: geze.pl@geze.com www.geze.pl Romania GEZE Romania S.R.L. www.geze.ro Russia OOO GEZE RUS www.geze.ru Scandinavia – Sweden GEZE Scandinavia AB E-Mail: sverige.se@geze.com www.geze.se Scandinavia – Norway GEZE Scandinavia AB avd. Norge E-Mail: norge.se@geze.com www.geze.no 141515-01 Scandinavia – Finland Scandinavia AB www.geze.com Scandinavia – Denmark GEZE Danmark E-Mail: danmark.se@geze.com www.geze.dk Singapore E-Mail: gezesea@geze.com.sg www.geze.com South Africa GEZE Distributors (Pty) Ltd. E-Mail: info@gezesa.co.za www.geze.co.za Switzerland GEZE Schweiz AG E-Mail: schweiz.ch@geze.com www.geze.ch Turkey GEZE Kapı ve Pencere Sistemleri www.geze.com Ukraine GEZE Ukraine TOV www.geze.ua United Arab Emirates/GCC GEZE Middle East E-Mail: geze@emirates.net.ae www.geze.ae United Kingdom GEZE UK Ltd. E-Mail: info.uk@geze.com www.geze.com

PDF | 3 MB
Product declaration LEED ECchain Chain drive
Product declaration (LEED, DGNB, EPD)

Product declaration LEED ECchain Chain drive

Reference: L09-1602 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Ecchain Product Rating ▪ The product contains … % recycled materials and contribute to achieve LEED credits within MR Credit 4. Indoor Environmental Quality (IEQ) - LEED Category IEQ Credit … : Low Emitting Materials: Adhesives and Sealants … Point  IEQ Credit … : Low Emitting Materials: Paints and Coatings … Point  IEQ Credit … : Low Emitting Materials: Flooring Systems … Point  IEQ Credit … : Low Emitting Materials: Composite Wood and Agrifiber Products … Point  Materials and Resources (MR) - LEED Category MR Credit 4: Recycled Content 1-2 Points 15% MR Credit 5: Regional Materials 1-2 Points See Location MR Credit 6: Rapidly Renewable Materials … Point  MR Credit 7: Certified Wood … Point  Product Characteristics Electric chain drive for daily aeration and ventilation for vertically installed windows with inward and outward opening bottom-hung, top-hung and sidehung casements. Direct opener in 230V version.The stroke can be adjusted via the cable connection on the drive to 200 and 400 mm. The drive is equipped with built-in limit switches and overload protection. Overload cut-off is controlled electronically. Drive brackets and chain attachments allow easy installation from the front. Stroke: 200 and 400 mm Tensile force/pressure: 250 N/250 N Voltage: 230 V AC. # # # About LEED & Products - www.usgbc.org This declaration helps to assess products easily according the certification system LEED® 2009 New Construction and Major Renovations NC & CS (excluded SCHOOLS). Products are not reviewed or certified by LEED. LEED credit requirements cover the performance of materials in aggregate, not the performance of individual products or brands. For more information about LEED visit www.usgbc.org/leed. The project team or the manufacturer is responsible to declare the compliance with the project requirements to achieve LEED points. Below you find an explanation of the symbols. Detailed information are on the next pages. Credit requirements fulfilled - the credit point can be achieved  Credit is not applicable to this product 22% X% of the product comply with the credit requirement — Required data not specified - for required data contact manufacturer Credit requirements are not fulfilled Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka   N/A If the location of 'Harvesting & Extraction' and 'Manufacturing' is within a radius of 500 miles of the project the subproduct contributes to the credit. N/A — … %  N/A … GEZE GmbH Ecchain A10 A9 A8 A7 A6 A5 GEZE GmbH A4 Plastics ~ … % N/A GEZE GmbH A3 Zinc die-cast ~ … % N/A ~ … % GEZE GmbH A2 Copper Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka *All values are based on the unit:1 element **LEED default recycled content for steel   Not specified N/A N/A N/A … % Not specified Not specified Not specified N/A Not specified N/A N/A N/A Not specified Not specified Not specified N/A Not specified Not specified N/A N/A N/A N/A N/A N/A N/A ~ … % GEZE GmbH A1 Steel parts Manufacturer Product Name No Not specified Not specified N/A Not specified Not specified 0% Location PostPreConsumer Consumer Harvesting/ Extraction 25%** Location Manufacturing Rapidly Renewable Material Regional Materials Recycled Content Composite Agrifiber product Flooring Systems VOCVOC in Limit in g/l g/l Mass per unit* [%] N/A Ecchain N/A Product Name N/A GEZE GmbH Certified Wood Manufacturer Detailed Rating Reference: L09-1602 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Reference: L09-1602 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Ecchain MR Credit 4: Recycled Content (1-2 Points) Intent To increase demand for building products that incorporate recycled content materials, thereby reducing impacts resulting from extraction and processing of virgin materials. Requirement Use materials with recycled content* such that the sum of post-consumer** recycled content plus one-half of the pre-consumer*** content constitutes at least 10%/20% (based on cost) of the total value of the materials in the project. The minimum percentage materials recycled for each point threshold is as follows: ▪ 10% Recycled Content -> … Point ▪ 20% Recycled Content -> … Points. * Recycled content is defined in accordance with the International Organization of Standards document, ISO 14021 — Environmental labels and declarations — Self-declared environmental claims (Type II environmental labeling). ** Postconsumer material is defined as waste material generated by households or by commercial, industrial and institutional facilities in their role as end-users of the product, which can no longer be used for its intended purpose. *** Preconsumer material is defined as material diverted from the waste stream during the manufacturing process. Reutilization of materials (i.e., rework, regrind or scrap generated in a process and capable of being reclaimed within the same process that generated it) is excluded. Detailed Rating No Product Name Manufacturer Recycled Content PrePostConsumer Consumer Contribution of Product A1 Steel parts GEZE GmbH 25%** 0% Accountable recycled content according to LEED is 25% (1 x Post-Consumer + … x Pre-Consumer). **LEED default recycled content for steel 25% A2 Copper GEZE GmbH Not specified Not specified No recycled content specified. — A3 Zinc die-cast GEZE GmbH Not specified Not specified No recycled content specified. — A4 Plastics GEZE GmbH Not specified Not specified No recycled content specified. — Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka Reference: L09-1602 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Ecchain MR Credit 5: Regional Materials (1-2 Points) Intent To increase demand for building materials and products that are extracted and manufactured within the region, thereby supporting the use of indigenous resources and reducing the environmental impacts resulting from transportation. Requirement Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% or 20%, based on cost, of the total materials value. If only a fraction of a product or material is extracted, harvested, or recovered and manufactured locally, then only that percentage (by weight) must contribute to the regional value. The minimum percentage regional materials for each point threshold is as follows: ▪ 10% Regional Materials -> … Point ▪ 20% Regional Materials -> … Points. Detailed Rating No Product Name Manufacturer Location Harvesting/ Extraction Location Manufacturing A1 Steel parts GEZE GmbH Not specified Not specified A2 Copper GEZE GmbH Not specified Not specified A3 Zinc die-cast GEZE GmbH Not specified Not specified A4 Plastics GEZE GmbH Not specified Not specified Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka

PDF | 164 KB
Product declaration LEED Slimchain
Certificate

Product declaration LEED Slimchain

Reference: L09-1603 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Slimchain Product Rating ▪ The product contains … % recycled materials and contribute to achieve LEED credits within MR Credit 4. Indoor Environmental Quality (IEQ) - LEED Category IEQ Credit … : Low Emitting Materials: Adhesives and Sealants … Point  IEQ Credit … : Low Emitting Materials: Paints and Coatings … Point  IEQ Credit … : Low Emitting Materials: Flooring Systems … Point  IEQ Credit … : Low Emitting Materials: Composite Wood and Agrifiber Products … Point  Materials and Resources (MR) - LEED Category MR Credit 4: Recycled Content 1-2 Points 8% MR Credit 5: Regional Materials 1-2 Points See Location MR Credit 6: Rapidly Renewable Materials … Point  MR Credit 7: Certified Wood … Point  Product Characteristics Electric chain drive for a smoke and heat extraction system for daily aeration and ventilation as well as safe and fast smoke and heat exhaust and smoke extraction on vertically installed, inward and outward opening bottom-hung, tophung and side-hung casements. Direct opener in 24 V version, drive is actuated via a micro-processor. The drive is equipped with electronic end position cut-off and overload protection and has electronically regulated soft start and soft stop. Synchronised multiple operation of up to … drives must be guaranteed without additional external module. Activation and adjustment of the synchro function is by means of integrated DIP switches without additional programming being necessary. Automatic switch-off when the end position is reached. Overload protection when opening and closing. Sealing via electronically defined pressure. Stroke: 300/500 and 800 mm Tensile force/pressure: 300 N/max. 200 N, stroke-dependent Voltage: 24 V DC / 230V with external mains adapter # # # About LEED & Products - www.usgbc.org This declaration helps to assess products easily according the certification system LEED® 2009 New Construction and Major Renovations NC & CS (excluded SCHOOLS). Products are not reviewed or certified by LEED. LEED credit requirements cover the performance of materials in aggregate, not the performance of individual products or brands. For more information about LEED visit www.usgbc.org/leed. The project team or the manufacturer is responsible to declare the compliance with the project requirements to achieve LEED points. Below you find an explanation of the symbols. Detailed information are on the next pages. Credit requirements fulfilled - the credit point can be achieved  Credit is not applicable to this product 22% X% of the product comply with the credit requirement — Required data not specified - for required data contact manufacturer Credit requirements are not fulfilled Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka   N/A If the location of 'Harvesting & Extraction' and 'Manufacturing' is within a radius of 500 miles of the project the subproduct contributes to the credit. — … GEZE GmbH Slimchain A10 A9 A8 A7 A6 Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka *All values are based on the unit:1 element **LEED default recycled content for steel N/A GEZE GmbH A5 Plastics ~ … % N/A GEZE GmbH A4 Zinc die-cast ~ … % N/A GEZE GmbH A3 Copper ~ … % GEZE GmbH A2 Aluminium ~ … % N/A  N/A N/A  N/A  … % Not specified … % Not specified Not specified Not specified N/A N/A N/A Not specified N/A N/A N/A Not specified Not specified Not specified N/A Not specified N/A N/A N/A Not specified Not specified Not specified N/A Not specified Not specified N/A N/A N/A N/A N/A N/A N/A ~ … % GEZE GmbH A1 Steel parts Manufacturer Product Name No Not specified Not specified N/A Not specified Not specified 0% Location PostPreConsumer Consumer Harvesting/ Extraction 25%** Location Manufacturing Rapidly Renewable Material Regional Materials Recycled Content Composite Agrifiber product Flooring Systems VOCVOC in Limit in g/l g/l Mass per unit* [%] N/A Slimchain N/A Product Name N/A GEZE GmbH Certified Wood Manufacturer Detailed Rating Reference: L09-1603 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Reference: L09-1603 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Slimchain MR Credit 4: Recycled Content (1-2 Points) Intent To increase demand for building products that incorporate recycled content materials, thereby reducing impacts resulting from extraction and processing of virgin materials. Requirement Use materials with recycled content* such that the sum of post-consumer** recycled content plus one-half of the pre-consumer*** content constitutes at least 10%/20% (based on cost) of the total value of the materials in the project. The minimum percentage materials recycled for each point threshold is as follows: ▪ 10% Recycled Content -> … Point ▪ 20% Recycled Content -> … Points. * Recycled content is defined in accordance with the International Organization of Standards document, ISO 14021 — Environmental labels and declarations — Self-declared environmental claims (Type II environmental labeling). ** Postconsumer material is defined as waste material generated by households or by commercial, industrial and institutional facilities in their role as end-users of the product, which can no longer be used for its intended purpose. *** Preconsumer material is defined as material diverted from the waste stream during the manufacturing process. Reutilization of materials (i.e., rework, regrind or scrap generated in a process and capable of being reclaimed within the same process that generated it) is excluded. Detailed Rating No Product Name Manufacturer Recycled Content PostPreConsumer Consumer Contribution of Product A1 Steel parts GEZE GmbH 25%** 0% Accountable recycled content according to LEED is 25% (1 x Post-Consumer + … x Pre-Consumer). **LEED default recycled content for steel 25% A2 Aluminium GEZE GmbH Not specified Not specified No recycled content specified. — A3 Copper GEZE GmbH Not specified Not specified No recycled content specified. — A4 Zinc die-cast GEZE GmbH Not specified Not specified No recycled content specified. — A5 Plastics GEZE GmbH Not specified Not specified No recycled content specified. — Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka Reference: L09-1603 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Slimchain MR Credit 5: Regional Materials (1-2 Points) Intent To increase demand for building materials and products that are extracted and manufactured within the region, thereby supporting the use of indigenous resources and reducing the environmental impacts resulting from transportation. Requirement Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% or 20%, based on cost, of the total materials value. If only a fraction of a product or material is extracted, harvested, or recovered and manufactured locally, then only that percentage (by weight) must contribute to the regional value. The minimum percentage regional materials for each point threshold is as follows: ▪ 10% Regional Materials -> … Point ▪ 20% Regional Materials -> … Points. Detailed Rating No Product Name Manufacturer Location Harvesting/ Extraction Location Manufacturing A1 Steel parts GEZE GmbH Not specified Not specified A2 Aluminium GEZE GmbH Not specified Not specified A3 Copper GEZE GmbH Not specified Not specified A4 Zinc die-cast GEZE GmbH Not specified Not specified A5 Plastics GEZE GmbH Not specified Not specified Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka

PDF | 138 KB
EC certificate of conformity THZ Comfort
Certificate

EC certificate of conformity THZ Comfort

PDF | 455 KB
Product declaration DGNB Slimchain
Certificate

Product declaration DGNB Slimchain

Reference: D12-1603 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Slimchain Product Characteristics Electric chain drive for a smoke and heat extraction system for daily aeration and ventilation as well as safe and fast smoke and heat exhaust and smoke extraction on vertically installed, inward and outward opening bottom-hung, top-hung and side-hung casements. Direct opener in 24 V version, drive is actuated via a microprocessor. The drive is equipped with electronic end position cut-off and overload protection and has electronically regulated soft start and soft stop. Synchronised multiple operation of up to … drives must be guaranteed without additional external module. Activation and adjustment of the synchro function is by means of integrated DIP switches without additional programming being necessary. Automatic switch-off when the end position is reached. Overload protection when opening and closing. Sealing via electronically defined pressure. Stroke: 300/500 and 800 mm Tensile force/pressure: 300 N/max. 200 N, stroke-dependent Voltage: 24 V DC / 230V with external mains adapter Product Rating ▪ The product meets the requirements of quality level … to … and contributes to achieve 100 (of max. 100 achievable) checklist points according to criterion 'ENV1.2 Local Environmental Impact'. ▪ The product does not lead to toxic or corrosive fumes in case of fire. Hence this product contributes to achieve 20 (of max. 20 achievable) checklist points according to criterion 'SOC … Safety and Security'. The product contains the following components: Mass per unit [%] K1 Steel parts 31% K2 Aluminium 13% K3 Copper 3% K4 Zinc die-cast 45% K5 Plastics 8% About DGNB Products - www.dgnb.de This declaration helps to assess products easily according the certification system DGNB. Products are not reviewed or certified by DGNB. DGNB credit requirements cover the performance of materials in aggregate, not the performance of individual products or brands. Therefore the project team or the manufacturer is responsible to declare the compliance with the project requirements to achieve DGNB points. Detailed information are on the next pages. Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of DGNB. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the DGNB criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the DGNB requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka MANUFACTURER GEZE GmbH PRODUCT NAME Slimchain Product assessment of complete system Topic Number ENV1.1 ENV1.2 Criteria Relevance Reference: D12-1603 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) Evaluation Life cycle Assessment - Emissions Local environmental impact ENV1. … Responsible procurement (Wood) ENV1. … Responsible procurement (Formwork) ENV1. … Responsible procurement (Natural Stone) Quality Level … is fulfilled Environmental Quality (ENV) Economic Quality (ECO) Sociocultural and Functional Quality (SOC) Technical Quality (TEC) ENV2.1 Life cycle Assessment - Primary Energy ENV2.2 Potable water demand and wastewater volume ENV2.3 Land Use ECO1.1 Building-related life-cycle costs ECO2.1 Suitability for conversion ECO2.2 Marketability SOC1.1 Thermal Comfort SOC1.2 Indoor Air Quality SOC1.3 Acoustic Comfort SOC1.4 Visual Comfort SOC1.5 Occupant control SOC1.6 Quality of outdoor spaces SOC1.7 Safety and security SOC2.1 Access for all SOC2.2 Public access SOC2.3 Cyclist facilities SOC3.1 Design and urban quality SOC3.2 Integration of public art SOC3.3 Floor Plan Qualities TEC1.1 Fire prevention TEC1.2 Noise protection TEC1.3 Building envelope quality TEC1.4 Adaptability of Technical Systems TEC1.5 Ease of cleaning and maintenance TEC1.6 Ease of dismantling and recycling TEC1.7 Sound immission control PRO1.1 Comprehensive project brief PRO1.2 Integral design PRO1.3 Design concept PRO1.4 Sustainability aspects in tender phase PRO1.5 Documentation for Facility Management PRO2.1 Environmental impact of construction PRO2.2 Construction quality assurance PRO2.3 Systematic commissioning SITE1.1 Site location risks SITE1.2 Public image and social conditions SITE1.3 Access to transportation SITE1.4 Access to specific-use facilities Process Quality (PRO) Site Quality (SITE) Siehe Produktbewertung SOC1.4 The product does not lead to toxic or corrosive fumes in case of fire Reference: D12-1603 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Slimchain Product assessment for criteria ENV1.2 - Local environmental impact The product fulfills the requirements for Quality Level 1-4 Assessment: Quality Level … Goals and Relevance Certain materials, construction products and preparations are a risk for soil, air, groundwater and surface water as well as for human's health, flora and fauna. In order to minimize risks for humans and the local environment, materials, (construction) products and preparations need to be reduced ,avoided or substituted, which due to their material properties or ingredients are a risk for surface and ground water, soil or air. Especially those materials, (construction) products and preparations must be reduced ,avoided or replaced, which affect human health, flora and fauna or harm within a short-, medium / or long-term period . This affects the entire life cycle - from production, processing at site, use of (building) inventory and disposal (dismantling, recycling, landfilling). These local risks are assessed material and product related. Hence eco-and human toxicological impact categories of LCA can not be applied due to lack of evaluation and measurement procedures. Product Assessment Relevant Products 26 Panels made of aluminum and stainless steel on the facade and the roof (sun protection systems are not currently considered) Subject: Products to passivation of aluminum and stainless steel Relevant Products 27 Factory coated metal components: cladding, doors, radiators, heating and cooling ceilings. Hot-dipped galvanizing are not considered as coatings for the purposes of this criterion. Subject: Primer and finish coat (for example, paints, varnishes, powder coatings) Relevant Products 28 Plastics for coating of surfaces (floor and wall) and components on the facade Other remarks on classification Requirements of Quality Levels Quality Level … No requirements Quality Level … No requirements Quality Level … Chromium VI-free passivation Quality Level … Chromium VI-free passivation Requirements of Quality Levels Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Requirements of Quality Levels Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Assessement of Product Evaluation Use of chromium-VI-free passivation agents Quality Level … Assessement of Product Evaluation No use of lead, cadmium and chromium VI compounds Quality Level … Assessement of Product Evaluation The lead and tin content of the plastics used is < … % Quality Level … Reference: D12-1603 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Slimchain Product assessment for criteria SOC1.7 - Safety and Security The product fulfills the requirments for prevention of fumes. Assessment: 20 of 20 Checklist Points Goals and Relevance A high sense of security contributes fundamentally to the comfort of human being. The goal is to avoid dangerous situations as much as possible and to reduce the impact of a non-preventable damage, as far as possible. The criterion safety and security assesses also the performance of products in case of fire. Product Assessment Relevant Requirements … Prevention from risks of fumes Requirements of Quality Levels 20 Checklist Points Other remarks on classification Assessement of Product The product does not lead to toxic or The product does not lead to toxic or corrosive fumes in case of fire corrosive fumes in case of fire. Evaluation 20 Checklist Points

PDF | 364 KB
Product declaration LEED Fanlight opener OL 90 N
Product declaration (LEED, DGNB, EPD)

Product declaration LEED Fanlight opener OL 90 N

Reference: L09-1424 / … .2012 Produkt Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Fanlight opener OL 90 N Product Rating ▪ The product fulfills the requirements for paints and coatings and contribute to achieve one LEED credit within IEQ Credit … . ▪ The product contains … % recycled materials and contribute to achieve LEED credits within MR Credit 4. Indoor Environmental Quality (IEQ) - LEED Category IEQ Credit … : Low Emitting Materials: Adhesives and Sealants … Point  IEQ Credit … : Low Emitting Materials: Paints and Coatings … Point IEQ Credit … : Low Emitting Materials: Flooring Systems … Point  IEQ Credit … : Low Emitting Materials: Composite Wood and Agrifiber Products … Point  Materials and Resources (MR) - LEED Category MR Credit 4: Recycled Content 1-2 Points 6% MR Credit 5: Regional Materials 1-2 Points See Location s MR Credit 6: Rapidly Renewable Materials … Point  MR Credit 7: Certified Wood … Point  Product Characteristics Slimline fanlight opener for daily aeration and ventilation with vertically installed rectangular windows with bottom-hung, top-hung or side-hung casements, inward opening. For window cleaning, the scissors can be disengaged quickly by pressing the release catch. Casement closing pressure can be adjusted at the casement bracket. Opening width max. 170mm by 80kg per leaf. RAL certified fanlight opener available in … standard colour and … special colour. # # # About LEED & Products - www.usgbc.org This declaration helps to assess products easily according the certification system LEED® 2009 New Construction and Major Renovations NC & CS (excluded SCHOOLS). Products are not reviewed or certified by LEED. LEED credit requirements cover the performance of materials in aggregate, not the performance of individual products or brands. For more information about LEED visit www.usgbc.org/leed. The project team or the manufacturer is responsible to declare the compliance with the project requirements to achieve LEED points. Below you find an explanation of the symbols. Detailed information are on the next pages. Credit requirements fulfilled - the credit point can be achieved  Credit is not applicable to this product 22% X% of the product comply with the credit requirement — Required data not specified - for required data contact manufacturer Credit requirements are not fulfilled Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka   N/A If the location of 'Harvesting & Extraction' and 'Manufacturing' is within a radius of 500 miles of the project the subproduct contributes to the credit. — … Oberlichtöffner OL 90 GEZE GmbH N A10 A9 A8 A7 A6 Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka *All values are based on the unit:1 element **LEED default recycled content for steel … GEZE GmbH A5 Powder coating ~ … % N/A GEZE GmbH A4 Plastics ~ … % N/A GEZE GmbH A3 Zinc die-cast ~ … % GEZE GmbH A2 Aluminium ~ … % N/A 50 N/A  N/A  … % Not specified 6% Not specified Not specified Not specified N/A N/A N/A Not specified Not specified N/A N/A N/A Not specified Not specified N/A Not specified Not specified N/A N/A N/A Not specified Not specified N/A Not specified N/A N/A N/A Not specified Not specified Not specified N/A Not specified Not specified 0% 25%** N/A N/A N/A N/A ~ … % GEZE GmbH Location PostPreConsumer Consumer Harvesting/ Extraction Manufacturer Product Name No A1 Steel galvanized Location Manufacturing Rapidly Renewable Material Regional Materials Recycled Content Composite Agrifiber product Flooring Systems VOCVOC in Limit in g/l g/l Mass per unit* [%] N/A Fanlight opener OL 90 N N/A Product Name N/A GEZE GmbH Certified Wood Manufacturer Detailed Rating Reference: L09-1424 / … .2012 Produkt Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Reference: L09-1424 / … .2012 Produkt Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Fanlight opener OL 90 N IEQ Credit … : Low Emitting Materials: Adhesives and Sealants (1 Point) Intent Reduce the quantity of indoor air contaminants that are odorous, irritating and/or harmful to the comfort and well-being of installers and occupants caused by adhesives and sealants applied on site. Requirement All adhesive, sealants and sealant primers used on the interior of the building (defined as inside of the weatherproofing system and applied on-site) must comply shall comply with the VOC content limits of the following: ▪ SCAQMD Rule #1168 (effective date of July 1, 2005 and rule amendment date of January 7, 2005), ▪ Aerosol Adhesives must comply with Green Seal Standard for Commercial Adhesives GS-36 requirements in effect on October 19, 2000. IEQ Credit … : Low Emitting Materials: Paints and Coatings (1 Point) Intent Reduce the quantity of indoor air contaminants that are odorous, irritating and/or harmful to the comfort and well-being of installers and occupants caused by paints and coatings applied on site. Requirement Paints and coatings used on the interior of the building (defined as inside of the weatherproofing system and applied on-site) must comply with the VOC content limits of the following: ▪ Green Seal Standard GS-11, Paints Edition, May 20, 1993, ▪ Green Seal Standard GC-03, Anti-Corrosive Paints, Second Edition, January 7, 1997, and ▪ South Coast Air Quality Management District (SCAQMD) Rule 1113, Architectural Coatings, rules in effect on January 1, 2004. Detailed Rating No Product Name Manufacturer Related Credit Product Type A1 Steel galvanized GEZE GmbH N/A N/A N/A N/A The product is no adhesive, sealant, paint or coating.  A2 Aluminium GEZE GmbH N/A N/A N/A N/A The product is no adhesive, sealant, paint or coating.  A3 Zinc die-cast GEZE GmbH N/A N/A N/A N/A The product is no adhesive, sealant, paint or coating.  A4 Plastics GEZE GmbH N/A N/A N/A N/A The product is no adhesive, sealant, paint or coating.  A5 Powder coating GEZE GmbH 50g/l 0g/l The product fulfills the requirements for paints & coatings. IEQ Credit Flats … (SCAQMD Rule 1113) VOC-Content Allowable Product Contribution of Product Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka Reference: L09-1424 / … .2012 Produkt Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Fanlight opener OL 90 N MR Credit 4: Recycled Content (1-2 Points) Intent To increase demand for building products that incorporate recycled content materials, thereby reducing impacts resulting from extraction and processing of virgin materials. Requirement Use materials with recycled content* such that the sum of post-consumer** recycled content plus one-half of the pre-consumer*** content constitutes at least 10%/20% (based on cost) of the total value of the materials in the project. The minimum percentage materials recycled for each point threshold is as follows: ▪ 10% Recycled Content -> … Point ▪ 20% Recycled Content -> … Points. * Recycled content is defined in accordance with the International Organization of Standards document, ISO 14021 — Environmental labels and declarations — Self-declared environmental claims (Type II environmental labeling). ** Postconsumer material is defined as waste material generated by households or by commercial, industrial and institutional facilities in their role as end-users of the product, which can no longer be used for its intended purpose. *** Preconsumer material is defined as material diverted from the waste stream during the manufacturing process. Reutilization of materials (i.e., rework, regrind or scrap generated in a process and capable of being reclaimed within the same process that generated it) is excluded. Detailed Rating No Product Name Manufacturer Recycled Content PostPreConsumer Consumer A1 Steel galvanized GEZE GmbH 25%** 0% Accountable recycled content according to LEED is 25% (1 x Post-Consumer + … x Pre-Consumer). **LEED default recycled content for steel 25% A2 Aluminium GEZE GmbH Not specified Not specified No recycled content specified. — A3 Zinc die-cast GEZE GmbH Not specified Not specified No recycled content specified. — A4 Plastics GEZE GmbH Not specified Not specified No recycled content specified. — A5 Powder coating GEZE GmbH Not specified Not specified No recycled content specified. — Contribution of Product Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka Reference: L09-1424 / … .2012 Produkt Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Fanlight opener OL 90 N MR Credit 5: Regional Materials (1-2 Points) Intent To increase demand for building materials and products that are extracted and manufactured within the region, thereby supporting the use of indigenous resources and reducing the environmental impacts resulting from transportation. Requirement Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% or 20%, based on cost, of the total materials value. If only a fraction of a product or material is extracted, harvested, or recovered and manufactured locally, then only that percentage (by weight) must contribute to the regional value. The minimum percentage regional materials for each point threshold is as follows: ▪ 10% Regional Materials -> … Point ▪ 20% Regional Materials -> … Points. Detailed Rating No Manufacturer Location Harvesting/ Extraction Location Manufacturing A1 Steel galvanized GEZE GmbH Not specified Not specified A2 Aluminium GEZE GmbH Not specified Not specified A3 Zinc die-cast GEZE GmbH Not specified Not specified A4 Plastics GEZE GmbH Not specified Not specified A5 Powder coating GEZE GmbH Not specified Not specified Product Name Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka

PDF | 189 KB
LEED product declaration Powerchain
Product declaration (LEED, DGNB, EPD)

LEED product declaration Powerchain

Reference: L09-1604 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Powerchain Product Rating ▪ The product contains 10% recycled materials and contribute to achieve LEED credits within MR Credit 4. Indoor Environmental Quality (IEQ) - LEED Category IEQ Credit … : Low Emitting Materials: Adhesives and Sealants … Point  IEQ Credit … : Low Emitting Materials: Paints and Coatings … Point  IEQ Credit … : Low Emitting Materials: Flooring Systems … Point  IEQ Credit … : Low Emitting Materials: Composite Wood and Agrifiber Products … Point  Materials and Resources (MR) - LEED Category MR Credit 4: Recycled Content 1-2 Points 10% MR Credit 5: Regional Materials 1-2 Points See Location MR Credit 6: Rapidly Renewable Materials … Point  MR Credit 7: Certified Wood … Point  Product Characteristics Electric chain drive for a smoke and heat extraction system for daily aeration and ventilation and safe and fast smoke and heat exhaust and smoke extraction on vertically or angled installed, inward and outward opening bottom-hung, tophung, and side-hung casements as well as for light domes and skylights. Direct opener in 24 V version. The drive is actuated via a micro-processor. The drive is equipped with electronic end position cut-off and overload protection and has electronically regulated soft start and soft stop. Synchronised multiple operation of up to … drives must be guaranteed without additional external module. Activation and adjustment of the synchro function is by means of integrated DIP switches without additional programming being necessary. Stroke: 600/800 and 1200 mm Tensile force/pressure: 600 N/max. 600 N, stroke-dependent Voltage: 24 V DC / 230 V with external mains adapter The GEZE chain drive Powerchain is suitable for installation in tested and certified GEZE SHEVs in accordance with EN 12101-2. # # # About LEED & Products - www.usgbc.org This declaration helps to assess products easily according the certification system LEED® 2009 New Construction and Major Renovations NC & CS (excluded SCHOOLS). Products are not reviewed or certified by LEED. LEED credit requirements cover the performance of materials in aggregate, not the performance of individual products or brands. For more information about LEED visit www.usgbc.org/leed. The project team or the manufacturer is responsible to declare the compliance with the project requirements to achieve LEED points. Below you find an explanation of the symbols. Detailed information are on the next pages. Credit requirements fulfilled - the credit point can be achieved  Credit is not applicable to this product 22% X% of the product comply with the credit requirement — Required data not specified - for required data contact manufacturer Credit requirements are not fulfilled Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka   N/A If the location of 'Harvesting & Extraction' and 'Manufacturing' is within a radius of 500 miles of the project the subproduct contributes to the credit. — … GEZE GmbH Powerchain A10 A9 A8 A7 A6 Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka *All values are based on the unit:1 element **LEED default recycled content for steel N/A GEZE GmbH A5 Plastics ~ … % N/A GEZE GmbH A4 Zinc die-cast ~ 35% N/A GEZE GmbH A3 Copper ~ … % GEZE GmbH A2 Aluminium ~ … % N/A  N/A N/A  N/A  Not specified … % … % Not specified Not specified Not specified N/A N/A N/A Not specified N/A N/A N/A Not specified Not specified Not specified N/A Not specified N/A N/A N/A Not specified Not specified Not specified N/A Not specified Not specified N/A N/A N/A N/A N/A N/A N/A ~ 40% GEZE GmbH A1 Steel parts Manufacturer Product Name No Not specified Not specified N/A Not specified Not specified 0% Location PostPreConsumer Consumer Harvesting/ Extraction 25%** Location Manufacturing Rapidly Renewable Material Regional Materials Recycled Content Composite Agrifiber product Flooring Systems VOCVOC in Limit in g/l g/l Mass per unit* [%] N/A Powerchain N/A Product Name N/A GEZE GmbH Certified Wood Manufacturer Detailed Rating Reference: L09-1604 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Reference: L09-1604 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Powerchain MR Credit 4: Recycled Content (1-2 Points) Intent To increase demand for building products that incorporate recycled content materials, thereby reducing impacts resulting from extraction and processing of virgin materials. Requirement Use materials with recycled content* such that the sum of post-consumer** recycled content plus one-half of the pre-consumer*** content constitutes at least 10%/20% (based on cost) of the total value of the materials in the project. The minimum percentage materials recycled for each point threshold is as follows: ▪ 10% Recycled Content -> … Point ▪ 20% Recycled Content -> … Points. * Recycled content is defined in accordance with the International Organization of Standards document, ISO 14021 — Environmental labels and declarations — Self-declared environmental claims (Type II environmental labeling). ** Postconsumer material is defined as waste material generated by households or by commercial, industrial and institutional facilities in their role as end-users of the product, which can no longer be used for its intended purpose. *** Preconsumer material is defined as material diverted from the waste stream during the manufacturing process. Reutilization of materials (i.e., rework, regrind or scrap generated in a process and capable of being reclaimed within the same process that generated it) is excluded. Detailed Rating No Product Name Manufacturer Recycled Content PrePostConsumer Consumer Contribution of Product A1 Steel parts GEZE GmbH 25%** 0% Accountable recycled content according to LEED is 25% (1 x Post-Consumer + … x Pre-Consumer). **LEED default recycled content for steel 25% A2 Aluminium GEZE GmbH Not specified Not specified No recycled content specified. — A3 Copper GEZE GmbH Not specified Not specified No recycled content specified. — A4 Zinc die-cast GEZE GmbH Not specified Not specified No recycled content specified. — A5 Plastics GEZE GmbH Not specified Not specified No recycled content specified. — Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka Reference: L09-1604 / … .2015 Product Declaration - LEED® 2009 New Construction And Major Renovations NC & CS Manufacturer GEZE GmbH Product Name Powerchain MR Credit 5: Regional Materials (1-2 Points) Intent To increase demand for building materials and products that are extracted and manufactured within the region, thereby supporting the use of indigenous resources and reducing the environmental impacts resulting from transportation. Requirement Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% or 20%, based on cost, of the total materials value. If only a fraction of a product or material is extracted, harvested, or recovered and manufactured locally, then only that percentage (by weight) must contribute to the regional value. The minimum percentage regional materials for each point threshold is as follows: ▪ 10% Regional Materials -> … Point ▪ 20% Regional Materials -> … Points. Detailed Rating No Product Name Manufacturer Location Harvesting/ Extraction Location Manufacturing A1 Steel parts GEZE GmbH Not specified Not specified A2 Aluminium GEZE GmbH Not specified Not specified A3 Copper GEZE GmbH Not specified Not specified A4 Zinc die-cast GEZE GmbH Not specified Not specified A5 Plastics GEZE GmbH Not specified Not specified Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of LEED. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the LEED criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the LEED requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka

PDF | 165 KB
Product declaration DGNB ECchain Chain drive
Product declaration (LEED, DGNB, EPD)

Product declaration DGNB ECchain Chain drive

Reference: D12-1602 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Ecchain Product Characteristics Electric chain drive for daily aeration and ventilation for vertically installed windows with inward and outward opening bottom-hung, top-hung and side-hung casements. Direct opener in 230V version.The stroke can be adjusted via the cable connection on the drive to 200 and 400 mm. The drive is equipped with built-in limit switches and overload protection. Overload cut-off is controlled electronically. Drive brackets and chain attachments allow easy installation from the front. Stroke: 200 and 400 mm Tensile force/pressure: 250 N/250 N Voltage: 230 V AC. Product Rating ▪ The product meets the requirements of quality level … to … and contributes to achieve 100 (of max. 100 achievable) checklist points according to criterion 'ENV1.2 Local Environmental Impact'. ▪ The product does not lead to toxic or corrosive fumes in case of fire. Hence this product contributes to achieve 20 (of max. 20 achievable) checklist points according to criterion 'SOC … Safety and Security'. The product contains the following components: Mass per unit [%] K1 Steel parts 61% K2 Copper 2% K3 Zinc die-cast 2% K4 Plastics 35% About DGNB Products - www.dgnb.de This declaration helps to assess products easily according the certification system DGNB. Products are not reviewed or certified by DGNB. DGNB credit requirements cover the performance of materials in aggregate, not the performance of individual products or brands. Therefore the project team or the manufacturer is responsible to declare the compliance with the project requirements to achieve DGNB points. Detailed information are on the next pages. Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of DGNB. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the DGNB criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the DGNB requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka MANUFACTURER GEZE GmbH PRODUCT NAME Ecchain Product assessment of complete system Topic Number ENV1.1 ENV1.2 Criteria Relevance Reference: D12-1602 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) Evaluation Life cycle Assessment - Emissions Local environmental impact ENV1. … Responsible procurement (Wood) ENV1. … Responsible procurement (Formwork) ENV1. … Responsible procurement (Natural Stone) Quality Level … is fulfilled Environmental Quality (ENV) Economic Quality (ECO) Sociocultural and Functional Quality (SOC) Technical Quality (TEC) ENV2.1 Life cycle Assessment - Primary Energy ENV2.2 Potable water demand and wastewater volume ENV2.3 Land Use ECO1.1 Building-related life-cycle costs ECO2.1 Suitability for conversion ECO2.2 Marketability SOC1.1 Thermal Comfort SOC1.2 Indoor Air Quality SOC1.3 Acoustic Comfort SOC1.4 Visual Comfort SOC1.5 Occupant control SOC1.6 Quality of outdoor spaces SOC1.7 Safety and security SOC2.1 Access for all SOC2.2 Public access SOC2.3 Cyclist facilities SOC3.1 Design and urban quality SOC3.2 Integration of public art SOC3.3 Floor Plan Qualities TEC1.1 Fire prevention TEC1.2 Noise protection TEC1.3 Building envelope quality TEC1.4 Adaptability of Technical Systems TEC1.5 Ease of cleaning and maintenance TEC1.6 Ease of dismantling and recycling TEC1.7 Sound immission control PRO1.1 Comprehensive project brief PRO1.2 Integral design PRO1.3 Design concept PRO1.4 Sustainability aspects in tender phase PRO1.5 Documentation for Facility Management PRO2.1 Environmental impact of construction PRO2.2 Construction quality assurance PRO2.3 Systematic commissioning SITE1.1 Site location risks SITE1.2 Public image and social conditions SITE1.3 Access to transportation SITE1.4 Access to specific-use facilities Process Quality (PRO) Site Quality (SITE) Siehe Produktbewertung SOC1.4 The product does not lead to toxic or corrosive fumes in case of fire Reference: D12-1602 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Ecchain Product assessment for criteria ENV1.2 - Local environmental impact The product fulfills the requirements for Quality Level 1-4 Assessment: Quality Level … Goals and Relevance Certain materials, construction products and preparations are a risk for soil, air, groundwater and surface water as well as for human's health, flora and fauna. In order to minimize risks for humans and the local environment, materials, (construction) products and preparations need to be reduced ,avoided or substituted, which due to their material properties or ingredients are a risk for surface and ground water, soil or air. Especially those materials, (construction) products and preparations must be reduced ,avoided or replaced, which affect human health, flora and fauna or harm within a short-, medium / or long-term period . This affects the entire life cycle - from production, processing at site, use of (building) inventory and disposal (dismantling, recycling, landfilling). These local risks are assessed material and product related. Hence eco-and human toxicological impact categories of LCA can not be applied due to lack of evaluation and measurement procedures. Product Assessment Relevant Products 26 Panels made of aluminum and stainless steel on the facade and the roof (sun protection systems are not currently considered) Subject: Products to passivation of aluminum and stainless steel Relevant Products 27 Factory coated metal components: cladding, doors, radiators, heating and cooling ceilings. Hot-dipped galvanizing are not considered as coatings for the purposes of this criterion. Subject: Primer and finish coat (for example, paints, varnishes, powder coatings) Relevant Products 28 Plastics for coating of surfaces (floor and wall) and components on the facade Other remarks on classification Requirements of Quality Levels Quality Level … No requirements Quality Level … No requirements Quality Level … Chromium VI-free passivation Quality Level … Chromium VI-free passivation Requirements of Quality Levels Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Requirements of Quality Levels Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Assessement of Product Evaluation Use of chromium-VI-free passivation agents Quality Level … Assessement of Product Evaluation No use of lead, cadmium and chromium VI compounds Quality Level … Assessement of Product Evaluation The lead and tin content of the plastics used is < … % Quality Level … Reference: D12-1602 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Ecchain Product assessment for criteria SOC1.7 - Safety and Security The product fulfills the requirments for prevention of fumes. Assessment: 20 of 20 Checklist Points Goals and Relevance A high sense of security contributes fundamentally to the comfort of human being. The goal is to avoid dangerous situations as much as possible and to reduce the impact of a non-preventable damage, as far as possible. The criterion safety and security assesses also the performance of products in case of fire. Product Assessment Relevant Requirements … Prevention from risks of fumes Requirements of Quality Levels 20 Checklist Points Other remarks on classification Assessement of Product The product does not lead to toxic or The product does not lead to toxic or corrosive fumes in case of fire corrosive fumes in case of fire. Evaluation 20 Checklist Points

PDF | 364 KB
Product declaration DGNB Fanlight opener OL 90 N
Product declaration (LEED, DGNB, EPD)

Product declaration DGNB Fanlight opener OL 90 N

Reference: D09-1424 / … .2012 Product Declaration - DGNB Neubauversion Büro- und Verwaltungsgebäude (NBV09) Manufacturer GEZE GmbH Product Name Fanlight opener OL 90 N Product Rating ▪ The product fulfills the requirements of action level … to … and contributes to achieve 10 (of max. 10) criterion points within Criterion 06 `Risks for the regional environment´. Criterion 06 Risks for the Local Environment - Ecological Quality Action Level … 1 Point Action Level … 5 Points Action Level … Points Action Level … 10 Points Criterion 08 Sustainable Resources - Ecological Quality* Action Level … 1 Points Action Level … 5 Points Action Level … 10 Points    * This criterion is only applicable to wooden materials. Product Characteristics Slimline fanlight opener for daily aeration and ventilation with vertically installed rectangular windows with bottom-hung, top-hung or side-hung casements, inward opening. For window cleaning, the scissors can be disengaged quickly by pressing the release catch. Casement closing pressure can be adjusted at the casement bracket. Opening width max. 170mm by 80kg per leaf. RAL certified fanlight opener available in … standard colour and … special colour. # About DGNB Products - www.dgnb.de This declaration helps to assess products easily according the certification system DGNB® Neubauversion Büro- und Verwaltungsgebäude (NBV09). Products are not reviewed or certified by DGNB. DGNB credit requirements cover the performance of materials in aggregate, not the performance of individual products or brands. Therefore the project team or the manufacturer is responsible to declare the compliance with the project requirements to achieve DGNB points. Below you find an explanation of the symbols. Detailed information are on the next pages. Credit requirements fulfilled - the action level is achieved  Credit is not applicable to this product 22% X% of the product comply with the credit requirement — Required data not specified - for required data contact manufacturer Credit requirements are not fulfilled # # Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of DGNB. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the DGNB criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the DGNB requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka   100 GEZE GmbH Fanlight opener OL 90 N A10 A9 A8 A7 A6 GEZE GmbH A5 Powder coating ~ … %       GEZE GmbH A4 Plastics ~ … %    GEZE GmbH A3 Zinc die-cast ~ … % GEZE GmbH A2 Aluminium ~ … %    GEZE GmbH A1 Steel galvanized ~ … % Action Level … Action Level … Action Level … Action Level …  Action Level …  Action Level … Steckbrief 08 Nachhaltige Ressourcenverwendung Steckbrief 06 Risiken für die lokale Umwelt Mass per Unit* [%] Manufacturer Product Name No  Fanlight opener OL 90 N  Product Name Action Level … GEZE GmbH *All values are based on the unit:1 element Manufacturer Detailed Rating Reference: D09-1424 / … .2012 Product Declaration - DGNB Neubauversion Büro- und Verwaltungsgebäude (NBV09) Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of DGNB. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the DGNB criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the DGNB requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka Reference: D09-1424 / … .2012 Product Declaration - DGNB Neubauversion Büro- und Verwaltungsgebäude (NBV09) Manufacturer GEZE GmbH Product Name Fanlight opener OL 90 N Criterion 06 Risks for the Local Environment - Ecological Quality Detailed Rating No Product Name Manufacturer A1 Steel galvanized GEZE GmbH Product Type Requirement Contribution of Product There are no requirements for this product No Product Name Manufacturer A2 Aluminium GEZE GmbH Product Type Requirement Contribution of Product There are no requirements for this product No Product Name Manufacturer A3 Zinc die-cast GEZE GmbH Product Type Requirement Contribution of Product There are no requirements for this product No Product Name Manufacturer A4 Plastics GEZE GmbH Product Type Requirement Contribution of Product Plastics for windows, floorings or wall claddings Action Level 1-3: ▪ No requirements Action Level 4: ▪ The product is free of lead, cadmium or tin stabilizer The product is free of lead, cadmium or tin stabilizer. Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of DGNB. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the DGNB criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the DGNB requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka Reference: D09-1424 / … .2012 Product Declaration - DGNB Neubauversion Büro- und Verwaltungsgebäude (NBV09) Manufacturer GEZE GmbH Product Name Fanlight opener OL 90 N No Product Name Manufacturer A5 Powder coating GEZE GmbH Product Type Requirement Contribution of Product Paints and coatings (without anti-corosion paints) Action Level 4: VOC-content < 3% Action Level 3: VOC-content < 10% Action Level 2: VOC-content < 15%; RAL UZ 12a count as proof Action Level 1: VOC-content < 25% VOC-content: 0% Action Level 4: VOC-content < 3% Action Level 3: VOC-content < 10% Action Level 2: VOC-content < 15%; RAL UZ 12a count as proof Action Level 1: VOC-content < 25% VOC-content: 0% Action Level 1-2: ▪ No requirements Action Level 3-4: ▪ Pigments and siccatives in varnishes are free of lead, cadmium, chromium VI or their compounds. Pigments and siccatives in the product contain no lead, cadmium, chromium VI or their compounds. Applied on non-mineral surfaces. Sealants, adhesives, and anti-corrosion Applied on mineral and non-mineral surfaces. Varnishes for walls, floorings, ceiling or roofs. Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of DGNB. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the DGNB criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the DGNB requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka

PDF | 139 KB
DGNB product declaration Powerchain
Product declaration (LEED, DGNB, EPD)

DGNB product declaration Powerchain

Reference: D12-1604 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Powerchain Product Characteristics Electric chain drive for a smoke and heat extraction system for daily aeration and ventilation and safe and fast smoke and heat exhaust and smoke extraction on vertically or angled installed, inward and outward opening bottom-hung, top-hung, and side-hung casements as well as for light domes and skylights. Direct opener in 24 V version. The drive is actuated via a micro-processor. The drive is equipped with electronic end position cutoff and overload protection and has electronically regulated soft start and soft stop. Synchronised multiple operation of up to … drives must be guaranteed without additional external module. Activation and adjustment of the synchro function is by means of integrated DIP switches without additional programming being necessary. Stroke: 600/800 and 1200 mm Tensile force/pressure: 600 N/max. 600 N, stroke-dependent Voltage: 24 V DC / 230 V with external mains adapter The GEZE chain drive Powerchain is suitable for installation in tested and certified GEZE SHEVs in accordance with EN 12101-2. Product Rating ▪ The product meets the requirements of quality level … to … and contributes to achieve 100 (of max. 100 achievable) checklist points according to criterion 'ENV1.2 Local Environmental Impact'. ▪ The product does not lead to toxic or corrosive fumes in case of fire. Hence this product contributes to achieve 20 (of max. 20 achievable) checklist points according to criterion 'SOC … Safety and Security'. The product contains the following components: Mass per unit [%] K1 Steel parts 40% K2 Aluminium 16% K3 Copper 4% K4 Zinc die-cast 35% K5 Plastics 5% About DGNB Products - www.dgnb.de This declaration helps to assess products easily according the certification system DGNB. Products are not reviewed or certified by DGNB. DGNB credit requirements cover the performance of materials in aggregate, not the performance of individual products or brands. Therefore the project team or the manufacturer is responsible to declare the compliance with the project requirements to achieve DGNB points. Detailed information are on the next pages. Notice: This declaration is a product of HOINKA GmbH. This data sheet is published in the online database greenbuildingproducts.eu. The distribution by third parties is prohibited. This declaration is no official certificate in terms of DGNB. The contents are based on manufacturer specifications. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the actuality or correctness of the published data. The interpretation of the DGNB criteria requirements can differ and depend on the project and the scope of application. In spite of a diligent treatment of all information HOINKA GmbH cannot guarantee the correctness of evaluation in terms of the DGNB requirements. The user of this declaration, the consumer of the product and the consultant/planner, who is advising this product in any construction projects, is responsible by himself to proof all data published in this document and to verify the permissibility for the designated application. The content of this data sheet does not manifest any legal relationship. With the publication of a new edition, this declaration can no longer be considered to be valid. The latest version is available in the internet. HOINKA GmbH ▪ greenbuildingproducts.eu ▪ Lembergweg 7/1 ▪ 71067 Sindelfingen ▪ Tel. +49 7031 7659-441 ▪ Fax +49 7031 7659-443 ▪ www.greenbuildingproducts.eu ▪ contact@greenbuildingproducts.eu ▪ Geschäftsführer: Dipl.-Ing. Thomas Hoinka MANUFACTURER GEZE GmbH PRODUCT NAME Powerchain Product assessment of complete system Topic Number ENV1.1 ENV1.2 Criteria Relevance Reference: D12-1604 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) Evaluation Life cycle Assessment - Emissions Local environmental impact ENV1. … Responsible procurement (Wood) ENV1. … Responsible procurement (Formwork) ENV1. … Responsible procurement (Natural Stone) Quality Level … is fulfilled Environmental Quality (ENV) Economic Quality (ECO) Sociocultural and Functional Quality (SOC) Technical Quality (TEC) ENV2.1 Life cycle Assessment - Primary Energy ENV2.2 Potable water demand and wastewater volume ENV2.3 Land Use ECO1.1 Building-related life-cycle costs ECO2.1 Suitability for conversion ECO2.2 Marketability SOC1.1 Thermal Comfort SOC1.2 Indoor Air Quality SOC1.3 Acoustic Comfort SOC1.4 Visual Comfort SOC1.5 Occupant control SOC1.6 Quality of outdoor spaces SOC1.7 Safety and security SOC2.1 Access for all SOC2.2 Public access SOC2.3 Cyclist facilities SOC3.1 Design and urban quality SOC3.2 Integration of public art SOC3.3 Floor Plan Qualities TEC1.1 Fire prevention TEC1.2 Noise protection TEC1.3 Building envelope quality TEC1.4 Adaptability of Technical Systems TEC1.5 Ease of cleaning and maintenance TEC1.6 Ease of dismantling and recycling TEC1.7 Sound immission control PRO1.1 Comprehensive project brief PRO1.2 Integral design PRO1.3 Design concept PRO1.4 Sustainability aspects in tender phase PRO1.5 Documentation for Facility Management PRO2.1 Environmental impact of construction PRO2.2 Construction quality assurance PRO2.3 Systematic commissioning SITE1.1 Site location risks SITE1.2 Public image and social conditions SITE1.3 Access to transportation SITE1.4 Access to specific-use facilities Process Quality (PRO) Site Quality (SITE) Siehe Produktbewertung SOC1.4 The product does not lead to toxic or corrosive fumes in case of fire Reference: D12-1604 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Powerchain Product assessment for criteria ENV1.2 - Local environmental impact The product fulfills the requirements for Quality Level 1-4 Assessment: Quality Level … Goals and Relevance Certain materials, construction products and preparations are a risk for soil, air, groundwater and surface water as well as for human's health, flora and fauna. In order to minimize risks for humans and the local environment, materials, (construction) products and preparations need to be reduced ,avoided or substituted, which due to their material properties or ingredients are a risk for surface and ground water, soil or air. Especially those materials, (construction) products and preparations must be reduced ,avoided or replaced, which affect human health, flora and fauna or harm within a short-, medium / or long-term period . This affects the entire life cycle - from production, processing at site, use of (building) inventory and disposal (dismantling, recycling, landfilling). These local risks are assessed material and product related. Hence eco-and human toxicological impact categories of LCA can not be applied due to lack of evaluation and measurement procedures. Product Assessment Relevant Products 26 Panels made of aluminum and stainless steel on the facade and the roof (sun protection systems are not currently considered) Subject: Products to passivation of aluminum and stainless steel Relevant Products 27 Factory coated metal components: cladding, doors, radiators, heating and cooling ceilings. Hot-dipped galvanizing are not considered as coatings for the purposes of this criterion. Subject: Primer and finish coat (for example, paints, varnishes, powder coatings) Relevant Products 28 Plastics for coating of surfaces (floor and wall) and components on the facade Other remarks on classification Requirements of Quality Levels Quality Level … No requirements Quality Level … No requirements Quality Level … Chromium VI-free passivation Quality Level … Chromium VI-free passivation Requirements of Quality Levels Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Quality Level … No use of lead, cadmium and chromium VI compounds Requirements of Quality Levels Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Quality Level … Content of lead and tin < … % Assessement of Product Evaluation Use of chromium-VI-free passivation agents Quality Level … Assessement of Product Evaluation No use of lead, cadmium and chromium VI compounds Quality Level … Assessement of Product Evaluation The lead and tin content of the plastics used is < … % Quality Level … Reference: D12-1604 / … .2015 Product Declaration - DGNB New Construction Office and Administration Buildings (NBV12) MANUFACTURER GEZE GmbH PRODUCT NAME Powerchain Product assessment for criteria SOC1.7 - Safety and Security The product fulfills the requirments for prevention of fumes. Assessment: 20 of 20 Checklist Points Goals and Relevance A high sense of security contributes fundamentally to the comfort of human being. The goal is to avoid dangerous situations as much as possible and to reduce the impact of a non-preventable damage, as far as possible. The criterion safety and security assesses also the performance of products in case of fire. Product Assessment Relevant Requirements … Prevention from risks of fumes Requirements of Quality Levels 20 Checklist Points Other remarks on classification Assessement of Product The product does not lead to toxic or The product does not lead to toxic or corrosive fumes in case of fire corrosive fumes in case of fire. Evaluation 20 Checklist Points

PDF | 364 KB